Summary

A new Innofact poll shows 55% of Germans support returning to nuclear power, a divisive issue influencing coalition talks between the CDU/CSU and SPD.

While 36% oppose the shift, support is strongest among men and in southern and eastern Germany.

About 22% favor restarting recently closed reactors; 32% support building new ones.

Despite nuclear support, 57% still back investment in renewables. The CDU/CSU is exploring feasibility, but the SPD and Greens remain firmly against reversing the nuclear phase-out, citing stability and past policy shifts.

  • BestBouclettes@jlai.lu
    link
    fedilink
    English
    arrow-up
    10
    arrow-down
    5
    ·
    2 days ago

    Wait until you see the price of climate change and not moving away from fossil fuels then

    • wewbull@feddit.uk
      link
      fedilink
      English
      arrow-up
      1
      arrow-down
      7
      ·
      1 day ago

      Speed! The best time to give a nuclear plant a green light was about 20 years ago, as it will just be coming online now. The second best time is never, because we don’t have time to wait anymore.

      Nuclear takes a long time to build, and in all that time you’re not switching away from fossil fuels. I swear nuclear proponents are fossil fuel shills just wanting to delay the day we switch away from them.

      • BestBouclettes@jlai.lu
        link
        fedilink
        English
        arrow-up
        5
        ·
        1 day ago

        Our largest power plant, with 6 reactors, was built in 6 years. To this day it provides us with around 6% of our global power requirements. It’s been running for 45 years, producing 32TWh per year with 0 carbon emissions.

        It’s like we could build them faster if we wanted to ? We’ve done it already, we can do it again.

        • wewbull@feddit.uk
          link
          fedilink
          English
          arrow-up
          1
          arrow-down
          4
          ·
          1 day ago

          45 years would be 1980. That sounds like you’re refering to Zaporizhzhia Nuclear Power Plant, but construction started in 1980, and although the first five reactors went live 5 years later the 6th reactor didn’t go live until 1996. 16 years later.

          Even so, you’re only counting construction. That plant would have been being designed for at least 5 years previous.

          And safety standards have gone up since then, in part because of it’s slightly older cousin at Chernobyl (different design, but also built in 5 years).

          • BestBouclettes@jlai.lu
            link
            fedilink
            English
            arrow-up
            4
            ·
            edit-2
            1 day ago

            I’m talking about Gravelines in France. The first reactor was plugged into the national grid 6 years after construction began. The 6th reactor in 1985.

            The EPR2 is already designed, and in service in Flamanville. Flamanville 3 took a long time because we had to rebuild our whole nuclear industry, by lack of political vision back in the 90’s-00’s.

            We’re building it again, two by two this time, and hopefully in less than half the time and budget.

            • wewbull@feddit.uk
              link
              fedilink
              English
              arrow-up
              2
              ·
              edit-2
              9 hours ago

              The EPR2 is already designed, and in service in Flamanville. Flamanville 3 took a long time because we had to rebuild our whole nuclear industry, by lack of political vision back in the 90’s-00’s.

              Flamanville is EPR, not EPR2. Flamanville’s delay is the reason for EPR2. EPR2 is not being built anywhere yet.

              EPR is one of my go to examples of how long nuclear takes.

              • Olikuloto 3 - Started 2005, Target 2010, Actual 2018
              • Flammanville 3 - Started 2007, Target 2012, Actual 2024
              • Hinkley point C - Started 2017, Target 2025, Expected 2031
              • Taishan 1 & 2 - Started 2009, 2010, Target 2013, 2014, Actual 2018, 2019
              • Sizewell C - Started 2023, Target 2032-2035

              So I grant you that EDF needed to rebuild knowledge, but 12 years after they started the first plant they started HPC. They increased the timescale from 5 to 7 years construction, but are still going to be at least 6 years late and 35% over budget. On Sizewell they’ve added another 2 years minimum with a window up to 5 extra years over HPC…for the fifth site in the family. We should be accelerating now, right? Even in China the timescale was 9 years.

              It’s not just EDF. Westinghouse had similar problems with Vogtle 3 starting construction in 2009 and completing in 2023. 14 years construction again.

              Can things get faster…sure, but 65% faster to get back down to 5 years. No.

    • FooBarrington@lemmy.world
      link
      fedilink
      English
      arrow-up
      4
      arrow-down
      8
      ·
      2 days ago

      Ah yes, that’s why we should invest money into an expensive form of energy instead of a cheap one, that will help us displace fossil fuels!

      • lumony@lemmings.world
        link
        fedilink
        English
        arrow-up
        7
        arrow-down
        3
        ·
        1 day ago

        Hate to break it to you, bud, but energy is already priced according to how expensive it is to provide.

        It’s not about “this energy source vs. that energy source.” It’s about increasing the supply of available energy.

        Read a book on energy and you’ll quickly realize that as we produce more energy, we consume more. Right now, our energy needs are not being met even with fossil fuels + nuclear + renewables.

        • FooBarrington@lemmy.world
          link
          fedilink
          English
          arrow-up
          3
          arrow-down
          4
          ·
          1 day ago

          Hate to break it to you, but with a limited amount of money you can only increase your generation so much. Choosing a power source that’s less efficient from a monetary perspective means you can displace less fossil fuel.

          Read a book on mathematics if you don’t believe me.

    • sexy_peach@feddit.org
      link
      fedilink
      English
      arrow-up
      7
      arrow-down
      9
      ·
      2 days ago

      Wait what I am 100% pro renewables…

      If nuclear somehow were the only option, I would support it. But it’s the worst option.