    It would be 20kW for each rack or two. The types of data centre deal they talk about these days are measured in GW of compute. That’s 50,000x just for 1GW.

    • NotMyOldRedditName@lemmy.world
      link
      fedilink
      English
      arrow-up
      1
      ·
      edit-2
      6 天前

      These aren’t big things, they’re small satellites. They’re going to be ~100kW. They only need to 5x the existing radiator they think will work.